Carrier Johnson - SANDAG MTS Bus Facility - 00 Exterior 02
+Architecture/Civic

SANDAG

SANDAG South Bay Bus Maintenance Facility

Vision


The previous South Bay Bus Maintenance Facility, built in 1995, had limited capacity to maneuver buses and perform required fuel, service, and operational tasks. The Metropolitan Transit System (MTS) proposed to buy an adjacent parcel of land to allow the facility to expand its fleet maintenance abilities.

Carrier Johnson - SANDAG MTS Bus Facility - 00 Exterior 01

The project expanded the South Bay Bus Maintenance Facility into a larger and more functional bus maintenance and operations base. The 10.6-acre site features a new administration building, a new high bay bus maintenance building, renovations to an existing maintenance building, a new bus wash facility and additional bus parking.

Carrier Johnson - SANDAG MTS Bus Facility - 00 Hero

Project Meta


Client

SANDAG

Completion

2014

Size

49,000 SF Bus Maintenance Facility; 12,645 SF Administrative Building

Construction Cost

$51,000,000

LEED Rating

Silver

Markets

Public Transit; Admin; Transit Facilities

Project Types

Civic

Services

Architecture

High Functionality

The new administration building is a 16,000 s.f. two-story building that includes administrative and driver support areas and houses the dispatching room, training areas, and offices. The bus maintenance and parts warehouse facility is a new 50,000 s.f., one-story building which maintains and services the buses.

The expansion and reconfiguration of the site increases site capacity from 174 buses to 240 buses, including new South Bay Bus Rapid Transit (BRT) buses. The high-capacity bus wash uses a reclaimed water system and is able to wash 250 buses every night – three times the amount of the previous facility. The expanded site also accommodates all service trucks, relief cars, and supervisor and staff vehicles.

Sustainable features of the project included natural daylighting, photovoltaic electricity generation, and a high-performance building envelope. This was the first design-build project of this scope administered by SANDAG.

Carrier Johnson - SANDAG MTS Bus Facility - 00 Exterior 03

Project Gallery