Shoreline Gateway Construction Progress


In The News |

Construction for the Shoreline Gateway project is on schedule, topping off in late October and due to be completed Summer 2021! Designed collaboratively by CJ+C, studio one eleven, and RELM, the Shoreline Gateway development is a 35-story residential and mixed-use tower that will be the tallest building in Long Beach. The tower will consist of 315 studio, one-, and two-bedroom apartments atop 6,460 square feet of ground-floor retail space, five levels of subterranean parking and amenity decks at the third floor and roof level.

📸 Photo Credit: Andre Campbell