3rd & A Construction Update


In The News |

Construction is underway for the 3rd & A mixed-use building in Downtown San Diego.  Designed by Carrier Johnson + CULTURE, the new 21-story tower replaces the building that was previously occupied by our San Diego Design Studio, and will include 4,020 sf of ground-floor retail and 270 residential units with a mix of studios, one- and two-bedroom options.   Amenities include a rooftop pool, fitness center, dog wash and outdoor gathering space, and will offer residents breathtaking views of Balboa Park, Bankers’ Hill, the bay and Downtown.  

Video credit: Alex Kacur